Controlled production, documented materials
Fabrication facilities, certified material stock and project-specific welding and inspection arrangements.
Production facilities in Antalya Free Zone
Capacity and stock figures are supplied for review and must be confirmed before public launch.
Materials, welding and inspection
Harman reports marine-grade AL5083 stock, including H111/H321 tempers, with 3.2 material certification and predominantly BV-certified stock. Welder qualifications, WPS/PQR and non-destructive testing are handled in accordance with project requirements.
Classification approvals, inspection scope and documentation packages must be confirmed per contract. ISO certification is not claimed.

Manufacturing infrastructure
Reported in-house equipment includes a CNC plasma cutting installation with a 12 m × 2 m working area, plus forming and hydraulic press equipment. Project-dependent fabrication can also be coordinated at customer facilities.
Discuss your next aluminium fabrication package
Share your drawings, vessel requirements or module scope to begin a technical and commercial discussion.
CONTACT HARMAN YACHTS